Xinjiang Zhongtai Backwater Station
Source: | Author:佚名 | Publishing time :2024-05-28 | 278 Views. | 🔊 Click to read aloud ❚❚ | Share:

The project is located on the east side of Tongxin Industrial Park, Alehui Town, Toksun County, Xinjiang. It is the construction project of the reclaimed water station for the company's resource comprehensive utilization to produce methanol upgrade demonstration project. The treated water capacity of the reclaimed water station is 600m ³/h, and the supporting evaporative crystallization is provided

MVR evaporation crystallization monomer

MVR evaporation crystallization inside

Pipeline corridor outside the plant

Membrane Shop Pump Room

Membrane Shop Filtration Equipment

Main plant area

Project Case