AGOGO - Full Field FPSO
Source: | Author:佚名 | Publishing time :2024-05-15 | 177 Views. | 🔊 Click to read aloud ❚❚ | Share:

M20,M21,M33 MODULE

Based on the owner's FEED model, complete 30%, 60%, and 90% detailed design modeling according to design requirements, including pipeline and stress pipeline calculation submission, equipment and electrical instrument equipment layout; Calculation of tray capacity, safety channel, equipment transfer channel, operation and maintenance space planning, addition of ISO drawings, MTO material list and other documents, pipeline pressure testing package, flange management, etc