ARCTIC LNG2
Source: | Author:佚名 | Publishing time :2024-05-15 | 168 Views. | 🔊 Click to read aloud ❚❚ | Share:

2-PGM-002&2-PGM-004

Power generation module

Based on the owner's 30% model, complete 60% and 90% detailed design modeling according to design requirements, including pipeline and stress pipeline calculation submission, equipment and electrical instrument equipment layout; Calculation of tray capacity, safety channel, equipment transfer channel, operation and maintenance space planning, addition of ISO drawings, MTO material list and other documents, pipeline pressure testing package, flange management, etc


Project Case